ImdexLeadingBrandLogo

Case Study

May 29, 2017

AMC BOS™ recovers an abandoned hole and boosts productivity in Arizona, USA

AMC BOS™ was a success at a mine site in Arizona, USA, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
May 31, 2017

AMC CIVIL MUD XTRA™ reduces fluid costs and downtime on major light rail project.

In metropolitan Sydney, Australia, AMC CIVIL MUD XTRA™ significantly improved trench wall stability and dispersion, assisting construction underneath a major arterial road. The bentonite free mud system minimised fluid loss and improved productivity, allowing the project to progress without interruption to surrounding road conditions.
May 28, 2018

AMC’s customised fluid system eliminated re-drills for piling project in Canberra, Australia

A light rail project in Canberra utilised AMC’s customised drilling fluid system and on-site support to successfully eliminate re-drills, problems caused by water incursion and manage environmental impact.
June 13, 2018

AMC BOS™ doubles metres drilled per day in Chile

AMC Borehole Optimisation System™ (AMC BOS™) successfully controlled fault zones and changing formations at a gold exploration project in Chile. This innovative system was able to have a positive effect on productivity and reduce the consumption of mud and water by effectively managing and preventing lost circulation, high torque and […]