ImdexLeadingBrandLogo

fluid

August 16, 2017

AMC BOS FIX™

AMC BOS FIX™ is a patent pending rapid fill grout, part of our new proactive solution for fluid loss and borehole instability – the AMC BOS™ (Borehole Optimisation System).
September 12, 2017

Scarborough geothermal project

As part of the construction of the Scarborough Beach Pool in Perth, Western Australia, AMC was involved with the supply and management of drilling fluids for the Scarborough Beach Pool Project’s geothermal drilling programme. Adam Jennings, Waterwell Manager for AMC in Perth discusses the achievements and challenges of the project.
February 28, 2018

AMC BOS™

Down the borehole, you can’t always predict when or how things will go wrong. AMC’s new, patent pending Borehole Optimisation System (AMC BOS™) anticipates fluid loss, lost circulation and unstable zones.
June 13, 2018

AMC BOS™ doubles metres drilled per day in Chile

AMC Borehole Optimisation System™ (AMC BOS™) successfully controlled fault zones and changing formations at a gold exploration project in Chile. This innovative system was able to have a positive effect on productivity and reduce the consumption of mud and water by effectively managing and preventing lost circulation, high torque and […]