ImdexLeadingBrandLogo

in-hole

May 29, 2017

AMC BOS™ saves 77% in operational costs compared to traditional cementing method

AMC BOS™ reduced drilling fluids needed by 50%, eliminated the need for a costly, time consuming cementing/grouting and improved the average bit life used.
May 29, 2017

AMC BOS™ recovers an abandoned hole and boosts productivity in Arizona, USA

AMC BOS™ was a success at a mine site in Arizona, USA, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
June 13, 2018

AMC BOS™ doubles metres drilled per day in Chile

AMC Borehole Optimisation System™ (AMC BOS™) successfully controlled fault zones and changing formations at a gold exploration project in Chile. This innovative system was able to have a positive effect on productivity and reduce the consumption of mud and water by effectively managing and preventing lost circulation, high torque and […]