AMC BOS™ reduced drilling fluids needed by 50%, eliminated the need for a costly, time consuming cementing/grouting and improved the average bit life used.
AMC BOS™ was a success at a mine site in Arizona, USA, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.