ImdexLeadingBrandLogo
September 12, 2016

AMC BORE HOLE STABILISER™ reduced total drilling costs by 34% in Western Australia

AMC BORE HOLE STABILISER™ successfully negated the need for traditional PVC casing at an underground mine in the Goldfields region of Western Australia.
April 21, 2016

AMC RESI DRILL™ delivers improved core recovery in North Western Australia

AMC RESI DRILL™ delivered improved core recovery and integrity and maintained hole stability in two locations in North Western Australia.
April 21, 2016

AMC’s SRU™ limits spill risks in protected area in Canada

AMC’s SRU™ was implemented to assist operations and reduce costs on site at a uranium drilling project, located in Canada’s Patterson Lake South.
January 18, 2016

AMC TORQUE GUARD™ delivers improved drilling performance in Kalgoorlie

AMC’s TORQUE GUARD™ enabled a project in the Goldfields of Western Australia to progress and improve production significantly.
October 21, 2015

REFLEX EZ-GAMMA™ successfully logs to new and extreme depths at KCGM Super Pit in Kalgoorlie

REFLEX has been the first to do a number of things, the most recent of which being the successful deployment of a memory based, driller operable gamma logging device down what is acknowledged as the deepest diamond drill hole ever drilled in Australia at 3011.5m.
October 21, 2015

REFLEX EZ-GAMMA™ successfully logs to new and extreme depths at KCGM Super Pit in Kalgoorlie

REFLEX has been the first to do a number of things, the most recent of which being the successful deployment of a memory based, driller operable gamma logging device down what is acknowledged as the deepest diamond drill hole ever drilled in Australia at 3011.5m.
October 12, 2015

AMC COREWELL™ delivers 91% core recovery in South Africa

AMC COREWELL™ overcame challenging geological conditions, facilitating the early completion of a hole in Northern Cape, South Africa.

Estudios de caso

January 4, 2017

AMC’s SRU™ facilitated the early completion of a civil construction project.

AMC’s SRU™ facilitated the early completion of the micro tunnelling project, reducing the project by four to seven days, while a further five days saving was gained by eliminating the need to dispose of up to 137,500L of fluid.
October 4, 2016

77% reduction in water use achieved by AMC’s HP SRU™ in the Arctic tundra

AMC’s Heli-portable SRU™ reduced the risk of environmental contamination, reducing water consumption and increasing efficiencies in Canada.
September 12, 2016

AMC BORE HOLE STABILISER™ reduced total drilling costs by 34% in Western Australia

AMC BORE HOLE STABILISER™ successfully negated the need for traditional PVC casing at an underground mine in the Goldfields region of Western Australia.
April 21, 2016

AMC RESI DRILL™ delivers improved core recovery in North Western Australia

AMC RESI DRILL™ delivered improved core recovery and integrity and maintained hole stability in two locations in North Western Australia.
April 21, 2016

AMC’s SRU™ limits spill risks in protected area in Canada

AMC’s SRU™ was implemented to assist operations and reduce costs on site at a uranium drilling project, located in Canada’s Patterson Lake South.
January 18, 2016

AMC TORQUE GUARD™ delivers improved drilling performance in Kalgoorlie

AMC’s TORQUE GUARD™ enabled a project in the Goldfields of Western Australia to progress and improve production significantly.