ImdexLeadingBrandLogo

grout

May 29, 2017

Ground breaking system for torque, fluid loss and borehole instability

The AMC Borehole Optimization System™ (AMC BOS™) makes wire-line drilling more predictable, and encourages proactive versus reactive drilling.
May 29, 2017

AMC BOS™ saves 77% in operational costs compared to traditional cementing method

AMC BOS™ reduced drilling fluids needed by 50%, eliminated the need for a costly, time consuming cementing/grouting and improved the average bit life used.
May 29, 2017

AMC BOS™ recovers an abandoned hole and boosts productivity in Arizona, USA

AMC BOS™ was a success at a mine site in Arizona, USA, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
May 29, 2017

Reactive versus proactive drilling: introducing the AMC BOS™

Content While no one would argue that fixing things as quickly as possible when they break is important, few realise the high costs associated with solely practising this mode of operation. Down the borehole, you can’t always predict when or how things will go wrong. And as accountability and productivity […]