ImdexLeadingBrandLogo

loss

May 31, 2017

AMC CIVIL MUD XTRA™ reduces fluid costs and downtime on major light rail project.

In metropolitan Sydney, Australia, AMC CIVIL MUD XTRA™ significantly improved trench wall stability and dispersion, assisting construction underneath a major arterial road. The bentonite free mud system minimised fluid loss and improved productivity, allowing the project to progress without interruption to surrounding road conditions.
August 1, 2017

Proactive measures for the borehole

Geodrilling International asks Cory Mackay, of Imdex, about AMC Drilling Fluids & Products’ recently launched borehole optimisation system, the AMC BOS.
August 16, 2017

AMC BOS FIX™

AMC BOS FIX™ is a patent pending rapid fill grout, part of our new proactive solution for fluid loss and borehole instability – the AMC BOS™ (Borehole Optimisation System).
February 28, 2018

AMC BOS™

Down the borehole, you can’t always predict when or how things will go wrong. AMC’s new, patent pending Borehole Optimisation System (AMC BOS™) anticipates fluid loss, lost circulation and unstable zones.