ImdexLeadingBrandLogo

productivity

May 29, 2017

AMC BOS™ saves 77% in operational costs compared to traditional cementing method

AMC BOS™ reduced drilling fluids needed by 50%, eliminated the need for a costly, time consuming cementing/grouting and improved the average bit life used.
May 29, 2017

AMC BOS™ recovers an abandoned hole and boosts productivity in Arizona, USA

AMC BOS™ was a success at a mine site in Arizona, USA, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
May 29, 2017

Reactive versus proactive drilling: introducing the AMC BOS™

Content While no one would argue that fixing things as quickly as possible when they break is important, few realise the high costs associated with solely practising this mode of operation. Down the borehole, you can’t always predict when or how things will go wrong. And as accountability and productivity […]
September 12, 2017

Scarborough geothermal project

As part of the construction of the Scarborough Beach Pool in Perth, Western Australia, AMC was involved with the supply and management of drilling fluids for the Scarborough Beach Pool Project’s geothermal drilling programme. Adam Jennings, Waterwell Manager for AMC in Perth discusses the achievements and challenges of the project.