February 13, 2015
AMC’s custom developed fluid solution and technical support enabled the successful completion of a difficult HDD bore, which faced challenging geological formations and where all previous fluids providers and engineering contractors had been unsuccessful.
August 18, 2014
Accessibility and environmental impact presented an expensive challenge for the customer’s exploration drilling project, remotely located in South Australia’s Flinders Ranges. AMC’s HP-SRU™ was trialled to minimise site footprint and reduce operational costs at the steep and densely vegetated site.
July 21, 2014
The trial demonstrated the unit’s principal economic benefits were reduced water and mud usage, together with associated costs, and improved drilling productivity (drilling KPIs). These benefits were estimated to be AU$7,134 (net savings) per rig per month.
July 18, 2014
A Chilean AMC SRU™ trial also demonstrated a significant reduction in water and mud consumption, together with other operating costs, when utilising the AMC SRU™ unit. The AMC SRU™ addressed the key challenges experienced at this site, where water access was limited and expensive.
April 20, 2014
With poor site access, minimal space for drilling and overflowing sumps, AMC’s SRU™ was considered an ideal solution for the drilling operator in Morobe, PNG
March 20, 2014
AMC’s SRU™ helped reduce water consumption, environmental impacts and costs of managing waste drilling fluid at an exploration site in Crescent Valley, USA.
December 6, 2013
AMC SRU™ reduced the client’s operational costs and environmental impact on site in the Sandy Desert, East Pilbara Western Australia.
Estudios de caso
October 21, 2015
REFLEX has been the first to do a number of things, the most recent of which being the successful deployment of a memory based, driller operable gamma logging device down what is acknowledged as the deepest diamond drill hole ever drilled in Australia at 3011.5m.
October 21, 2015
REFLEX has been the first to do a number of things, the most recent of which being the successful deployment of a memory based, driller operable gamma logging device down what is acknowledged as the deepest diamond drill hole ever drilled in Australia at 3011.5m.
October 12, 2015
AMC COREWELL™ overcame challenging geological conditions, facilitating the early completion of a hole in Northern Cape, South Africa.
February 13, 2015
AMC’s custom developed fluid solution and technical support enabled the successful completion of a difficult HDD bore, which faced challenging geological formations and where all previous fluids providers and engineering contractors had been unsuccessful.
August 18, 2014
Accessibility and environmental impact presented an expensive challenge for the customer’s exploration drilling project, remotely located in South Australia’s Flinders Ranges. AMC’s HP-SRU™ was trialled to minimise site footprint and reduce operational costs at the steep and densely vegetated site.
July 21, 2014
The trial demonstrated the unit’s principal economic benefits were reduced water and mud usage, together with associated costs, and improved drilling productivity (drilling KPIs). These benefits were estimated to be AU$7,134 (net savings) per rig per month.