July 18, 2014
A Chilean AMC SRU™ trial also demonstrated a significant reduction in water and mud consumption, together with other operating costs, when utilising the AMC SRU™ unit. The AMC SRU™ addressed the key challenges experienced at this site, where water access was limited and expensive.
April 20, 2014
With poor site access, minimal space for drilling and overflowing sumps, AMC’s SRU™ was considered an ideal solution for the drilling operator in Morobe, PNG
March 20, 2014
AMC’s SRU™ helped reduce water consumption, environmental impacts and costs of managing waste drilling fluid at an exploration site in Crescent Valley, USA.
December 6, 2013
AMC SRU™ reduced the client’s operational costs and environmental impact on site in the Sandy Desert, East Pilbara Western Australia.
Case Studies
January 4, 2017
AMC’s SRU™ facilitated the early completion of the micro tunnelling project, reducing the project by four to seven days, while a further five days saving was gained by eliminating the need to dispose of up to 137,500L of fluid.
October 4, 2016
AMC’s Heli-portable SRU™ reduced the risk of environmental contamination, reducing water consumption and increasing efficiencies in Canada.
September 12, 2016
AMC BORE HOLE STABILISER™ successfully negated the need for traditional PVC casing at an underground mine in the Goldfields region of Western Australia.
April 21, 2016
AMC RESI DRILL™ delivered improved core recovery and integrity and maintained hole stability in two locations in North Western Australia.
April 21, 2016
AMC’s SRU™ was implemented to assist operations and reduce costs on site at a uranium drilling project, located in Canada’s Patterson Lake South.
January 18, 2016
AMC’s TORQUE GUARD™ enabled a project in the Goldfields of Western Australia to progress and improve production significantly.