January 4, 2017
AMC’s SRU™ facilitated the early completion of the micro tunnelling project, reducing the project by four to seven days, while a further five days saving was gained by eliminating the need to dispose of up to 137,500L of fluid.
October 4, 2016
AMC’s Heli-portable SRU™ reduced the risk of environmental contamination, reducing water consumption and increasing efficiencies in Canada.
September 12, 2016
AMC BORE HOLE STABILISER™ successfully negated the need for traditional PVC casing at an underground mine in the Goldfields region of Western Australia.
April 21, 2016
AMC RESI DRILL™ delivered improved core recovery and integrity and maintained hole stability in two locations in North Western Australia.
April 21, 2016
AMC’s SRU™ was implemented to assist operations and reduce costs on site at a uranium drilling project, located in Canada’s Patterson Lake South.
January 18, 2016
AMC’s TORQUE GUARD™ enabled a project in the Goldfields of Western Australia to progress and improve production significantly.
October 21, 2015
REFLEX has been the first to do a number of things, the most recent of which being the successful deployment of a memory based, driller operable gamma logging device down what is acknowledged as the deepest diamond drill hole ever drilled in Australia at 3011.5m.
October 21, 2015
REFLEX has been the first to do a number of things, the most recent of which being the successful deployment of a memory based, driller operable gamma logging device down what is acknowledged as the deepest diamond drill hole ever drilled in Australia at 3011.5m.
October 12, 2015
AMC COREWELL™ overcame challenging geological conditions, facilitating the early completion of a hole in Northern Cape, South Africa.
February 13, 2015
AMC’s custom developed fluid solution and technical support enabled the successful completion of a difficult HDD bore, which faced challenging geological formations and where all previous fluids providers and engineering contractors had been unsuccessful.
August 18, 2014
Accessibility and environmental impact presented an expensive challenge for the customer’s exploration drilling project, remotely located in South Australia’s Flinders Ranges. AMC’s HP-SRU™ was trialled to minimise site footprint and reduce operational costs at the steep and densely vegetated site.
July 21, 2014
The trial demonstrated the unit’s principal economic benefits were reduced water and mud usage, together with associated costs, and improved drilling productivity (drilling KPIs). These benefits were estimated to be AU$7,134 (net savings) per rig per month.
Case Studies
May 31, 2017
In metropolitan Sydney, Australia, AMC CIVIL MUD XTRA™ significantly improved trench wall stability and dispersion, assisting construction underneath a major arterial road. The bentonite free mud system minimised fluid loss and improved productivity, allowing the project to progress without interruption to surrounding road conditions.
May 29, 2017
AMC BOS™ was a success at a mine site in Arizona, USA, saving a borehole that had been abandoned, reducing the costs and improving the productivity of the hole.
May 29, 2017
AMC BOS™ reduced drilling fluids needed by 50%, eliminated the need for a costly, time consuming cementing/grouting and improved the average bit life used.
May 19, 2017
Published: CSIRO Mining Equipment, Technology and Services booklet, May 2017 Imdex Ltd is an ASX listed mining technology provider to the global minerals industry, headquartered in Perth, Western Australia. The company has operation in all key mining and exploration regions throughout Asia Pacific, Africa, Europe and the Americas. Imdex develops […]
May 19, 2017
Published: CSIRO Mining Equipment, Technology and Services booklet, May 2017 Imdex Ltd is an ASX listed mining technology provider to the global minerals industry, headquartered in Perth, Western Australia. The company has operation in all key mining and exploration regions throughout Asia Pacific, Africa, Europe and the Americas. Imdex develops […]
January 31, 2017
AMC’s BORE HOLE STABILISER™ performed exceptionally well compared to the existing program and resulted in an increased hole utilisation rate of 30% and produced significantly more holes per hour.